Fall 2016 Lake Harding Drawdown

September 24 – November 1, 2016

September 24 - November 1, 2016
Saturday

Website
https://georgiapowerlakes.com/bartlettsferry/2016/08/25/fall-2016-lake-harding-drawdown/

Location
Bartletts Ferry Dam


A drawdown of Bartletts Ferry or Lake Harding is scheduled for this September & October assuming adequate flow conditions exist in the Chattahoochee River to refill the reservoir. The reservoir will start down Saturday, September 24th and reach the drawdown bottom elevation of 513’ by October 1st. The lake refill will begin on November 1st and reach full pool based on inflows.

CCA9AEEB-1C99-47FA-AE0D-94CEB80625F5



Quick Links
Lake Harding News
Lake Harding Photos
Lake Harding Videos




About Us
Contact Us
Site Map
Search Site
Advertise With Us
   
www.LakeHardingNews.com
THE LAKE HARDING WEBSITE

Copyright 2024, Lakes Online
Privacy    |    Legal